Kontrak Jasa Konsultasi Rp10.000.000 (Belum termasuk PPN, Vendor PKP & punya NPWP, PPh 23 2%):
1. Skema Potong Langsung (DPP Nilai Lain 11/12):
• DPP Nilai Lain = 11/12 × Rp10.000.000 = Rp9.166.667.
• PPN Terutang (12% × DPP) = Rp1.100.000 (efektif 11%).
• PPh 23 Dipotong (2% × Rp10.000.000) = Rp200.000.
• Transfer ke Vendor = Rp10.000.000 + Rp1.100.000 − Rp200.000 = Rp10.900.000 (Total Beban Perusahaan = Rp11.100.000).
2. Skema Gross-Up (Vendor terima bersih penuh):
• Nilai Dasar di-gross-up = Rp10.000.000 / (1 − 0,02) = Rp10.204.082.
• DPP Nilai Lain = Rp9.353.741 → PPN = Rp1.122.449, PPh 23 = Rp204.082.
• Transfer ke Vendor = Rp11.122.449 (Rp10.000.000 bersih + PPN Rp1.122.449), Total Beban Perusahaan = Rp11.326.531.